Stoughton Trailer -shear.
UWI -cut to length, remove Cu and
bevel ends ~ 5 min
PSL-cut Cu strips, wire brush ~1 min.
adding air knife cleaning stage.
Some trouble with Cu hairs.
Shearing - needs sharper blade
and better QA.
About 60 boards made.
| Previous slide | Next slide | Back to first slide | View graphic version |