Illinois/Italy Central Muon Wall and CMX Arch in the assembly hall
View Toward Collision Hall (behind the arch). The central
detector is in the assembly hall and folks are installing cables on
the west endplug calorimeter.
Crate containing 16 BMU stacks lowered by crane
Duncan Carlsmith, Jim Bellinger, Bob Handler and first 16 installed
BMU stacks
Bob Handler, WooHyun Chung, Jim Bellinger and first 16 installed BMU
stacks
Duncan Carlsmith, east toroid steel, first 16 BMU stacks, CMX
arches
Fermilab motion system for toroid steel
John Voirin installed BMU Front Support arcs
Rear BMU Support Arcs and empty cable trays